MANILA, Philippines — The Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding along EDSA, with the proposed design released on Wednesday., This news data comes from:http://gyglfs.com
The plan calls for detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system leading to Makiling Creek.

According to the proposal, the project will be implemented in three phases covering 182 hectares: a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
MMDA unveils plan to build rainwater impounding facilities in Camp Aguinaldo
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm/hr over 24 hours) and exceeding the needed 36,945 cubic meters.
MMDA’s schematic shows that under normal weather, water bypasses the pond and traverses the lagoon to EDSA; during heavy rains, floodgates divert flows into the pond; after rains, pumps discharge stored water slowly to EDSA toward Makiling Creek.
The scope of work covers the impounding area, an operations and power house, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.
Officials said operations and maintenance arrangements and a memorandum of agreement were being discussed..
- US halts 80% complete, huge offshore wind farm
- Philippine experts urge harm reduction strategy for tobacco control
- COA probes Iqbal on spending of P1.7B in one day
- Comelec: Postponed village, youth elections not in 2026 budget
- Hontiveros pushes P15,000 salary hike for teachers
- Lawmaker linked to anomalous flood control projects in US for medical reasons, says House spokesman
- Prime minister of Yemen's Houthi-run government killed in Israeli strike
- WBO champ looms as Pacquiao’s next opponent
- Isko Moreno files charges against contractor over illegal demolition of sports complex in Manila
- ERC amends net-metering rules to expand renewable energy options